CSW|ST2 was the design engineer and surveyor for the improvements to the Ignacio Boulevard interchange at U.S. Highway 101. Design included widening the overpass and approaches to accommodate a new traffic lane and bike lane, new northbound on-ramps, and general circulation improvements to handle increased traffic loads resulting from nearby development. Reports, plans, specifications and estimates were prepared to Caltrans requirements.

6_2